It might seem obvious, but before I could build the boat, I had to build (or acquire) the place I'd build the boat: flat, level, and in the heat of summer.
Every build log I read said the same thing: the boat inherits the accuracy of whatever it's built on. The jig sits on the platform, the frames sit on the jig, the hull sits on the frames. Get the bottom of that stack wrong and you spend two years compensating for it. So before a single kit part could come out of the crate, there was a much less romantic project to do: a shelter, and under it, a dead-flat, dead-level platform.
The ground fights back
The "site preparation" chapter of my plan didn't mention that the ground had opinions.
The platform began as a simple-sounding problem: a level, dry, sturdy floor to carry a 5.80-metre plywood ocean-racing hull and its strongback through fourteen months of construction. It turned out to hinge on the ground it sat on. The site was a driveway that fell roughly 22 centimetres front to back and twisted several centimetres side to side, and, unfortunately, was further split between about 2.7 metres of asphalt and a strip of soft grass, with rainwater sheeting straight down its length towards where the structure would go. The one non-negotiable principle: the structure must bridge the asphalt-to-grass seam, not hinge on it, and it should also allow water to readily pass under it.
Three concerns shaped every decision. First, weight. A hull and jig concentrate real load at their bearing points, so the floor had to carry far more than a casual garden deck, without sagging or shifting over fourteen months. Second, water: both the runoff crossing the site and the ground moisture that would rise into a covered workspace. Third, weather. The whole thing had to stand up to winter snow and ice beneath a fabric shelter and stay dry enough underneath that damp never crept into the build.
Two things set the size of the floor before a single beam was bought. First, the boat: the jig the frames stand on, plus enough room to walk, work and clamp all the way around a 5.80-metre hull. Second, the party tent that would go over it. At roughly 4.0 × 7.3 m, the tent had to cover all of that, so the platform was planned to match it.
The 4×4 mistake


My original design called for 4×4 (89 × 89 mm) pressure-treated beams as the platform's bones. On paper they looked chunky, stable and obvious. In practice they were a miserable failure that I should have seen coming. Used as horizontal beams, 4×4s are weaker under vertical load than they look. They are less stiff than a doubled 2×6, and they sag over a span.
So the whole load went back. With limited resources, I had no other way to haul it than a small 2.4-metre trailer. Thankfully, the police were not there to see the 25 km drive to the lumberyard, or if they were, they decided to look the other way. If you've never returned a stack of 4.9-metre pressure-treated 4×4s, it's a nightmare. Every beam that had originally come off the truck via a forklift had to go back onto the trailer by hand. Reloaded, re-hauled, and re-explained at an unsympathetic returns counter: hours of sweat to end up exactly where I'd started, minus the optimism. Buying lumber is simple logistics. Un-buying it is penance.

Next: the redesign, and building the shop floor.